We'd love to hear from you.

VISIT OUR OFFICE / SHOWROOM
*STRICTLY BY APPOINTMENT ONLY

24 Pioneer Crescent #06-08 WestPark BizCentral Singapore 628557

Getting to Vento

By Car

  • Park at the basement car park near to 24 Lift Lobby (yellow zone)
  • At 24 Lift Lobby , take the lift to 6M (mezzanine level)
  • Exit lift lobby, turn right to the first unit

 

By Bus

  • From Jurong Point MRT station: 249, 251
  • Alight at Tanjong Kling bus stop

Business Enquiries

Email:enquiry@vento.sg
Phone:+65 6382 4466
Fax:+65 6515 9504

Send Us A Message

  • This field is for validation purposes and should be left unchanged.

Site Procedure 1: Sub-frame Stage

Installation of Sub-frame
– Sub-frame is cut into size on site
– Corner joint is used for ensuring the perpendicularity of sub-frame
– Galvanized strip and Hilti products are used to fix the sub-frame to the wall structure
Advantages of Sub-frame system
– Generally has better water tightness performance
– Can be used for precast or cast in-situ wall systems which do not require plastering
– Allow greater flexibility in the sequencing of works of other trades; the sub-frame is installed first so that the wet trades around the window can be completed before subsequent installation of the main frame
– The main frame are installed after completion of all wet trades around the windows and hence, are subjected to lower risk of physical damages